Project Management

This free online project management course teaches the methods of project planning, scheduling, and controlling. The course consists of 57 tutorials which cover the material of a typical introductory project management course at the university level.

In order to gain a comprehensive understanding of the subject, you should start at the top and work your way down the list. That way you will start learning the most basic concepts first and build off of those as you progress through the course.
Project Management

Gantt Charts

1. How to draw a Gantt chart
2. How to draw a Gantt chart example #1
3. How to draw a Gantt chart example #2

4. How to draw a Gantt chart example #3
5. How to draw a Gantt chart example #4
6. How to draw a Gantt chart with more complicated predecessors
7. Advantages and disadvantages of Gantt charts
​8. Gantt Chart Software

​

Precedence Diagram Method (PDM Network Diagram)

9. How to draw a PDM network diagram
10. Construct a PDM network diagram when given a table of dependencies
11. Construct a table of dependencies when given a PDM network diagram
12. Determine Early Start (ES) and Early Finish (EF) of activities in a network diagram
13. Determine Late Start (LS) and Late Finish (LF) of activities in a network diagram

14. Use forward and backward pass to determine project duration and critical path 

15. Critical path of a project with multiple initial activities
16. Critical path of a project with multiple finishing activities
17. Critical path of a project with multiple starts & finishing activities
​
18. Multiple Critical Paths Network Diagram
​19. Network Diagram & Critical Path Software

Critical Path Method (CPM Network Diagram)

20. Introduction to CPM network diagrams
21. How to draw a CPM Network Diagram
22. CPM vs. PDM Network Diagram example
​

Float / Slack in Network Diagrams

23. What is Total Float (Total Slack) and how to calculate it in a network diagram
24. What is Free Float (Free Slack) and how to calculate it in a network diagram
25. Determine total float and free float (aka "slack") of activities in a network diagram


Lead / Lag in Network Diagrams

26. Lead & Lag in network diagrams explained
27. Logical relationships in network diagrams illustrated
28. Finish to Start (FS) network diagram example with lag

29. Start to Start (SS) network diagram example with lag
30. Finish to Finish (FF) network diagram example with lag
31. Start to Finish (SF) network diagram example with lag
32. Difficult network diagram example with lag solved


Work Breakdown Structure (WBS)

33. What is a work breakdown structure?
34. Introduction to PMI numbering system


Resource Constraining & Project Crashing

35. Resource histogram explained
36. Resource constraining example with resource histogram
37. Project crashing explained
38. Project crashing full example (part 1/2)
39. Project crashing full example (part 2/2)


Project Tracking & Control

40. How to draw project S-curve for cumulative costs
41. How to draw project S-curve for % complete
42. Compare baseline S-curves for Early Start and Late Start

43. Project Cumulative Cost Software

Earned Value Analysis

44. Earned Value Analysis explained
45. Cost performance index (CPI) and cost variance (CV) explained
46. Schedule performance index (SPI) and schedule variance (SV) explained
47. Earned Value Analysis worked example
48. How to interpret an earned value graph
49. How to make predictions using earned value analysis


Program Evaluation and Review Technique (PERT)

50. How to calculate expected duration, variance, and std. deviation of an activity
51. How to draw an ADM network diagram for PERT problems
52. Complete the forward and backward pass of a network diagram for PERT
53. How to calculate expected duration, variance, and std. dev. of the entire project
54. What is the probability that a project will finish early or late
55. What is the probability that an activity will finish early, late, or during an interval
56. How to estimate project completion date with at least 95% confidence level
57. What is the probability that an activity will have a certain float (slack)



More Free Courses

C++ Programming
Calculus 1
Calculus 2
Chemistry

Circuits
Differential Equations

Dynamics
​Linear Algebra
Mechanics of Materials
Project Management
Statics

Structural Analysis

Recommended Books

Engineer4Free Project Management Notes
Project Management Book
Engineer4Free Project Management Notes PDF

Engineer4Free
​Project Management Notes

This is a 28-page print out of the work from all of the Project Management videos for quick reference or offline use.

Download the Project Management Notes PDF (plus all other course printouts), and directly support the work that I am doing for as little as $2.
Get The PM Notes
Engineer4Free Project Management Notes PDF Page 7
Page 7
Engineer4Free Project Management Notes PDF Page 7
Page 13
Engineer4Free Project Management Notes PDF Page 21
Page 21


Become a Patron

Project Management Patreon

 👉  Please support my work on Patreon 👈 ​
Social
yt | fb | tw | ig | in
  ©​ Copyright ​www.engineer4free.com 2012 - 2026 All Rights Reserved
About | Course List | Patreon | Newsletter | Blog | ToS | Contact
 
Engineer4Free is committed to sustainability. You should be too.
  • Home
  • C++ Programming
  • Circuits
  • Calculus 1
  • Calculus 2
  • Chemistry
  • Differential Equations
  • Dynamics
  • Linear Algebra
  • Mechanics of Materials
  • Project Management
  • Statics
  • Structural Analysis
  • Home
  • C++ Programming
  • Circuits
  • Calculus 1
  • Calculus 2
  • Chemistry
  • Differential Equations
  • Dynamics
  • Linear Algebra
  • Mechanics of Materials
  • Project Management
  • Statics
  • Structural Analysis